Skip to content

About

Selected projects

Bloch sphere with sampled state distribution and surrounding parameterized circuit gate traces
IBM Qiskit

Summary

End-to-end replication of PQC expressibility and QNN classification accuracy studies using Qiskit Machine Learning and PyTorch.

PRJ-008IBM Qiskit2021–2022

Quantum Machine Learning Replication Study

Expressibility of parameterized quantum circuits and QNN classification accuracy via Qiskit

Challenge

Qiskit lacked integrated ML tooling; bridging quantum circuits and classical optimizers required new infrastructure.

Contribution

Built full replication pipeline using Qiskit TorchConnector; reproduced expressibility plots and classification accuracy within 5% error.

Outcome

Demonstrated Qiskit as a viable end-to-end QML platform; contributed to Qiskit community documentation and GitHub.

View project